View Single Post
Old 01-07-2014, 07:03 PM   #202 (permalink)
AzSpeng
Enthusiast Member
 
AzSpeng's Avatar
 
Join Date: Nov 2013
Location: Chandler, Az
Posts: 345
Drives: Skyline GTR
Rep Power: 12
AzSpeng is a jewel in the roughAzSpeng is a jewel in the roughAzSpeng is a jewel in the roughAzSpeng is a jewel in the rough
Send a message via AIM to AzSpeng
Default

cycle time on this part is estimated at 23.5 minutes. should take this big ol block of aluminum and machine it down to roughly 10% of its starting weight.

no finish pass on the inside or outside. whatever finish is left with indexable tooling is the final finish it gets. (still pretty darn good)
AzSpeng is offline   Reply With Quote