Making tiny bits of progress but time is very limited during the week. The engine bay is basically all buttoned up except for the tower bar. BOV is installed. Wiring is all cleaned up for the scavenge pump. Wastegates are prepped and ready to be installed. Turbo is clocked and ready to go in. Turbo manifold is on. By the way, torquing the manifold bolt on the driver's side next to the steering knuckle is a breeze if you use a crows foot from the top through the engine bay. Otherwise it's hard to get a socket flush on the head.
All that's left is the fuel pump and installing the turbo, wastegates, and remaining exhaust