11-08-2013, 01:18 PM
|
#630 (permalink)
|
Ronin Samurai - Assassin
Join Date: Dec 2011
Location: Fayettenam,Pennsyltucky
Age: 68
Posts: 35,217
Drives: 2011 Nismo GM 6M
Rep Power: 2684438
|
Quote:
Originally Posted by wstar
Starting today I've got 2 weeks to the next Driver's Edge event at TWS that I'm booked for. The job list between now and then:
1) Paint cage
2) I still have a very small coolant leak somewhere to track down and fix
3) Build some kind of dash switch/gauge panel
4) Install SPL FUCA
5) Put on new tires/wheels (18x10 square Forgestars + 275/35 RS-3's)
6) Play with alignment (I picked up one of those DIY home alignment kits from Quicktrick)
7) Swap all the fluids and do basic track prep
|
Have fun.
|
|
|