That's a lot of work people can't do sometimes. I say 150lbs torque spec and drill two holes for 2 bolts next to the main nut. Drill pilot holes in the main nut and new bolt heads and safety wire it down. Then bushings.
__________________
13 370z-
Last edited by synolimit; 08-02-2013 at 01:13 PM.
|