Quote:
Originally Posted by cv129
I called today, got through on my third attempt, seems like they are now doing a v4 for more caster adjustment, and aiming to be tested with Nismo09 in approximately 2 weeks.
Production + assembly are estimated to be 2 months. Theoretically, the fastest we will be able to get it is about 3 months from now.
I hope this is the final version
|
Well what I call the proto III's (hopefully the final version) are done per SPL and on their way to Houston (today - being driven by Sean himself) to get electroless nickel plated. Hopefully they will be back in Austin by next Tues/Wed so I can get them on the car for the Texas World Speedway event next weekend. I will call on Tuesday and find out the status. I have my fingers crossed.