Quote:
Originally Posted by DR_
I blame Nismo09 If he didn't ask for even more negative camber they might have gone to production with the second prototype..
|
I called today, got through on my third attempt, seems like they are now doing a v4 for more caster adjustment, and aiming to be tested with Nismo09 in approximately 2 weeks.
Production + assembly are estimated to be 2 months.
Theoretically, the fastest we will be able to get it is about 3 months from now.
I hope this is the final version