Thread: epoxy feed back
View Single Post
Old 03-01-2013, 03:38 PM   #26 (permalink)
4r3s
A True Z Fanatic
 
Join Date: Dec 2009
Location: MD
Posts: 2,077
Drives: Touring 370z
Rep Power: 24
4r3s has a reputation beyond repute4r3s has a reputation beyond repute4r3s has a reputation beyond repute4r3s has a reputation beyond repute4r3s has a reputation beyond repute4r3s has a reputation beyond repute4r3s has a reputation beyond repute4r3s has a reputation beyond repute4r3s has a reputation beyond repute4r3s has a reputation beyond repute4r3s has a reputation beyond repute
Default

Quote:
Originally Posted by leighspped View Post
think i gotta get a heater to help it dry..... its a little cold
Make sure you double check the directions. All the products when I originally looked into this wanted to be applied at an ambient temperature >= 50 F so I put the project off till the spring time. Hate to see you do all that work just to have it lift or peel.
4r3s is offline   Reply With Quote