a little update on future plans:
1.
Re-doing black fangs next week with satin black paint and clear coat! Most likely Tuesday 10/6/09 - Wednesday 10/7/09.
2.
Getting Stillen G3 CAI and
Fast Intentions TDX CBE Installed on Saturday 10/10/08
3.
WORKS VS-XX hopefully sometime in JANUARY
(i decided not to add a lip kit yet to rosalena. i'll wait for the perfect one to come out.)
after i'm done with the new rims, here's what can possibly be next:
1. POSSIBLY getting Eibach springs with the rims to drop the car!
2. Fast Intentions Long Tube Headers (after i get the long tubes, time for a tune!!)
3. Z1 Silicone Radiator Hoses (Red)
4. Stillen Ground Kit (Red)
5. Sound System (i know exactly what parts to get thanks to
bigaudiofanat - yes i will be using a Z-Enclosure box)
6. Oil Cooler (haven't decided which one)
7. Sway Bars (preferably Cusco)
8. Aftermarket Lip Kit (totally undecided on which one)
Check with me & Rosalena from time to time