View Single Post
Old 02-15-2013, 10:31 AM   #925 (permalink)
Davey
A True Z Fanatic
 
Davey's Avatar
 
Join Date: Apr 2011
Location: Indiana
Posts: 3,766
Drives: '15 NISMO 6MT
Rep Power: 117171
Davey has a reputation beyond reputeDavey has a reputation beyond reputeDavey has a reputation beyond reputeDavey has a reputation beyond reputeDavey has a reputation beyond reputeDavey has a reputation beyond reputeDavey has a reputation beyond reputeDavey has a reputation beyond reputeDavey has a reputation beyond reputeDavey has a reputation beyond reputeDavey has a reputation beyond repute
Default

Quote:
Originally Posted by JARblue View Post
Are you taking a bath while you post this? Great to hear everything is finished and you're enjoying your bathroom
Oh, it's not finished... Today is the end of the 4th week.

There was an issue with the window. The glass block manufacturer changed their "diamond" pattern to a new pattern which is almost completely transparent rather than the prismatic type of pattern it had before. Like, I could have charged admission to watch my wife shower behind this.

So we found a local company that would build the window in-place and he actually had the right blocks ready to go. They did that yesterday.

My guy has been waiting on that window to finish out the durock in the shower and tile it. He's got most of the floor tiled, new ceiling fan/light, etc so it's coming along, but that damn window was a big hold-up.

But... I can at least take a bath in there, and I don't have to thumb tack a trash bag to the window frame every night.
Davey is offline