Quote:
Originally Posted by Mike
I used U-coatit. It was expensive, but has held up great for 10 years now. 1st coat of epoxy is greatly diluted with water so it seeps into the concrete, and then a full strength coat after that, followed with urethane topcoat.
If whatever coating you buy is water based, might be a good idea to do the watered down coat first.
|
I was able to get a two-part epoxy coating for the floor, no water base.
I found a home for the airbags, so that minor headache is out of the way.. tomorrow morning early is GO TIME.
Woo. Z looks so sad outside lmao.