Quote:
Originally Posted by Davey
Well, I'm at the end of week 2 of no bathroom, and my patience is wearing thin with these guys.
This is the first time I've ever hired a contractor to do a big job like this and it just seems like everything they do is half-assed or wrong and then I have to tell them to fix it.
He didn't order my window so my shower area is still not tiled, in fact there are still open studs.
I'm actually considering telling them to **** off and having someone else come and do it at this point.
|
That sux Davey. Seems like it is the norm rather than the exception though