I went to Nissan today to check on the status of the motor being reassembled. The back plate, timing chains and front plate were all installed. The tech was working on installing the dc motors for the VVEL before I lifted. He also installed the NST crank pulley. I took a pic of the inside of one of the dc motors so you can see what it looks like inside (sorry for the blurriness). By weds the motor is going to be back in the car and on friday the motor will be started for the first time. All gaskets and seals are also being replaced as the motor is put back together.