Today I am finishing up all the exhaust components, welding the waste gate flanges on and checking things for the last time...
The last check is to see if everything fits together as intended, so that all the flanges line up just right:
This is done with each "set" of pipes. Althout each pipe is interchangeable I still number them and the go out together as a set. This will be completed by the end of today if all goes smoothly of course. Tomorrow morning I will weld the BOV flanges to the IC pipe, and that will mean that all the fabrication is complete.
After the BOV flanges are done, I will proceed to the oil lines. Those will take a few hours but should also be done tomorrow. Sunday I hope to pack up the first kit, so that I have an accurate weight/size of the package(s).
The turbos, BOV's and waste gates will be shipped out next week from my supplier (Dynosty in Lousiville, KY). You all (that have sent deposits) should have the fuel pump, FMIC and UpRev by now. If not please let me know.