Quote:
Originally Posted by Boosted Performance
I guess it is. However, I am now focused on completing the 5 kits that I have deposits for. After that, I have to build two kits for the 350z's since I have two deposits for that. Then, once those are done I can finish the last kit for the 370z.
Tonight I need to weld in the BOV flanges and the IC piping is then 100% complete. Should have everything done this week.
So, things are looking good.
|
I hope my "extra options" don't throw you off.