View Single Post
Old 05-16-2012, 07:44 AM   #225 (permalink)
bdl99
Base Member
 
Join Date: Oct 2010
Location: NJ
Posts: 244
Drives: Nissan GT-R 2011
Rep Power: 15
bdl99 is a jewel in the roughbdl99 is a jewel in the roughbdl99 is a jewel in the rough
Default

Quote:
Originally Posted by Boost_lee View Post
Looks good

Just curious...Will the wires be loomed or shrink wrapped by chance?
I didn't on the test units because there is interest in monitoring the other wires to see what else is possible.

For the production units I wasn't planning on looming or adding shrink wrap but could. I would probably use split loom tubing if I do. I am also trying to keep the cost down wherever possible, the tubing isn't expensive but these will all be made by hand so every additional item adds time and therefore cost.
bdl99 is offline   Reply With Quote