Just got off the phone with PowerFab. Said everything but the HalTech box has arrived. The Tein Comfort Sports are on back order but doesn't look like there will be a problem receiving them on time. The HRE order is going in today. Should hear something back on the offsets soon. The manifolds, turbine housings and, downpipes are back from PolyDyn. Waiting on pictures. The I/C does have some cast parts on it so we're waiting to see what PolyDyn's coating looks like before we send it for coating. The engine is at the machine shop so once PowerFab receives that back, game on! That's it for now.
|