Quote:
Originally Posted by Joe@ZSpeed
As long as there are no issues with it I would say 3-4 weeks to finalize everything and get them into production.
I will not post pics of my design yet, We have already "copied" once before on a very popular shield. I've put a lot of time/effort/money into this shield and would like to try and get some of it back before they get Xeroxed.
|
Understandable! Well make sure to post when they are ready for sale. My money is ready and waiting!
__________________
Stillen Gen 3, Motordyne M370 Intake Manifold,
25 row oil cooler, Z1 test pipes, Greddy Ti-C 70mm dual exhaust, 15mm front/20mm rear spacers, RE-11's, V1 detector, LED interior lights, LED tag lights, Password JDM CF engine and radiator cooling covers.
|