I have one more weekend of drag racing to go (this coming sat.) and i just opened the shipping boxes with my stage 2 SC in it. What a pain to open the boxes . These things are packed so well and wrapped with tape and plastic wrap it takes forever to open them up.
GTM must use tons of packing foam chips to protect the products that they send you and the box was packed perfectly and every thing was
There is a packing list included in the main box which details every part that is in the box.
All the bolts are in separate plastic sealed boxes and tagged and labled so you know where they go.
Pablo does an oustanding job of shipping the parts.
Everything that i have received from GTM has been over packed and i have never had any broken parts from SAM.
No wonder it takes a little extra time to get the goods from him.
Well worth the wait and he emails me or calls me with the tracking #.
But i did look at the stage 2 SC . what a nice piece of equipment it is.
And yes it was packed in 2 boxes, both packed well.
Coming next from GTM my stage 4, 7 AT. april 2012.
I sent a brand new 7 AT to build for me (100 miles on it )
If it works as well as his torque converter it will take me down the 1/4 mile very quickly.
The converter gave me 0.42 of a reduction in my time. On a stock moter with bolt ons.
Z Eliminator