View Single Post
Old 10-26-2011, 10:22 PM   #84 (permalink)
Razzo
Base Member
 
Join Date: Oct 2011
Location: So Cal
Posts: 22
Drives: 2012 370Z PW 7AT
Rep Power: 14
Razzo is on a distinguished road
Default

My order sheet looks like that as well. Commit date was September 7. Production Month: 10/11 and ETA: Month of 12/11. So it looks like they build roughly a month after ordered? and it takes roughly two months from them building it to it being at the dealer?
Razzo is offline   Reply With Quote