Quote:
Originally Posted by 2011 Nismo#91
When I was looking to do mine the time to do the basic front was about a day and the front half was 2 days. And the costs are insane here in the NY area unless you go with a no name brand clear coat and a shady installer.
|
Wow, it took two guys about two and a half hours to apply the 3M clear bra.
__________________
Waiting on the Z35! SOLD - 2011 Gun Metallic Touring 7AT w Sports Pkg & Nav, Nismo Bumper and Rims, RC Grille, RC Brake Ducts, H&R Spacers, Painted Door Hdls, GTR Start Button, Nav By-Pass, EVO R Fog Light, CF Ducktail, CF Interior Trim
|