Quote:
Originally Posted by cossie1600
If he had the repairs within the 18 months period, does he still have a grace period on filing the claim?
|
The way I read it the 18 months was from delivery date. The date could be extended by 12 months but only if the lemon law ultimatum had already been exercised within the initial 18 months.