Quote:
Originally Posted by Mkai0
Looks Good! I noticed two coolers, one for the tranny and one for the engine I'm guessing? How long did the install take? I'm still waiting on mine it's been in the shop for 6 days now!
|
Oil cooler and the other is a Rotrex traction fluid cooler. The said it would probably be Monday so 4-5 days.