View Single Post
Old 08-08-2011, 08:04 PM   #2 (permalink)
JB-370z
A True Z Fanatic
 
JB-370z's Avatar
 
Join Date: Apr 2009
Location: Houston, Tx
Posts: 1,859
Drives: Stage 2 Twin Turbos
Rep Power: 19
JB-370z is on a distinguished road
Default

Quote:
Originally Posted by Footloose301 View Post
Well the time is nearing and I'm about ready to order a stage 2 turbo kit and just wanted some to chime in on the process time. My car is my daily driver so down time means A LOT!

How long did it take from the time you ordered the kit to the time it was delivered? A few days/weeks/months?

How long does it typically take a shop to install the entire kit? A week? 2 weeks?

Thanks.




I know I could sort through 5756484 threads and maybe get answers but this will be easier for everyone to find.
3-6 days depending on the shops experience level.
__________________
ll Baker Tuning ll GTM ll Powerhouse Amuse ll HKS ll Up-Rev ll iForged ll AP Racing ll Pioneer ll SPL ll Bride ll Top Secret ll OS Giken ll
GTM Stage 2 Twin Turboed 370z (First in Texas, Thanks To Baker Tuning)
JB-370z is offline   Reply With Quote