View Single Post
Old 08-08-2011, 07:50 PM   #1 (permalink)
Footloose301
A True Z Fanatic
 
Footloose301's Avatar
 
Join Date: Apr 2010
Location: Naples, FL
Posts: 2,659
Drives: 40th
Rep Power: 21
Footloose301 has much to be proud ofFootloose301 has much to be proud ofFootloose301 has much to be proud ofFootloose301 has much to be proud ofFootloose301 has much to be proud ofFootloose301 has much to be proud ofFootloose301 has much to be proud ofFootloose301 has much to be proud ofFootloose301 has much to be proud of
Default How long to get/install the kits?

Well the time is nearing and I'm about ready to order a stage 2 turbo kit and just wanted some to chime in on the process time. My car is my daily driver so down time means A LOT!

How long did it take from the time you ordered the kit to the time it was delivered? A few days/weeks/months?

How long does it typically take a shop to install the entire kit? A week? 2 weeks?

Thanks.




I know I could sort through 5756484 threads and maybe get answers but this will be easier for everyone to find.
__________________
2010 40th Anniversary 370Z
Footloose301 is offline   Reply With Quote