Big Update!
Been spending 40 hours per week the past month working on the paint and carbon stuff.
Almost done buffing the paint and such, carbon roof is done.
Installed the nitrous tanks after painting them (using a Zex system but not the Zex bottle...opted for a pair of OBX bottles due to their size).
Carbon fabrication of the door pulls, window switch covers, door sills and interior panels are just about done.
....Im going to need a vacation after this lol....
|