Quote:
Originally Posted by F.I. Inc.
It might of cooled off a bit because it was getting later however, it was still hot and muggy outside by the time we left. The timeframe between the stock runs and just the cat back were about 30-45 minutes. The reonated test pipe runs came about an hour after that and the HFC runs were about 30 minutes after that.
The fans were in the exact same spot on every run and the hood was positioned the same every time.
|
Wait, you did 4 runs? stock, cat back, cat back and test pipes, and cat back and HFC? I only see a dyno for 3 runs. Where is the chart for the HFC? Just curious to see the difference between test pipes and HFC. Thanks for the data. I'll be saving up for this exhuast for sure.