Quote:
Originally Posted by Vinny
Hey everyone! I bought a stage 2 TT kit for my Z a few months ago, and I'm looking into upgrading some of the internals. Does anyone have an idea of the labor time would be for new pistons-rods and head studs? I'm assuming I'd have to replace my fuel pump/injectors along with that, correct?
|
Labor time i would assume around 40 hrs. pulling the engine , about 16 hrs to r & r engine plus another 24 (ish) to rebuild engine plus machine shop for balancing. as for fuel pump no and if your keep the boost levels at a reasonable level then no injectors either.
Are you replacing rods/pistions for "piece of mind"? or to turn boost levels up?